History[Clear]
5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

NO.:JWSM001728
0 reviews | Write a review
Our Price:$1344.47

Qty: -+

5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

 

Product Description

5.5L Capacity Water Chiller Equipment Chilling Equipment

Water Cooling Machine

Application of Water Cooling Machine: protect jewelry metal smelting furnace and saving water

 

Advantages of Water Cooling Machine:

1、Water cooling machine is an optional part. Smelting Furnace can also be operated with the water pump hanging behind the machine. Without water cooling the machine will automatic stop heating. But it wasts the water largely. And when it's not enough water providing, using the smelting furnace is not very safe alone.

2、Equipped with the water cooling machine, when metal smelting the water will be recycled very well. It's saving water and protect the smelting furnace better.

 

5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

 

Product Feature

5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

 

Illustration of 5.5L Smelting Furnace with Water Cooling Machine

Advantages of water cooling machine:

With water cooling machine, the water can be recycled and more safe, and it can protect the smelting furnace better. Only put 4 liters of water full of water chiller, it can be used half of month. But for more safety, we advise check the water chiller every 3-4 months from upper cap whether there is enough water inside. If not enough, refill room upper cap until it's full.

 

Attention of water cooling machine:

1、Water cooling machine is an optional part. The smelting furnace can also be operated with the water pump hanging behind the machine. Without water cooling machine the machine can be automatically stop heating.

2、When first time use, add 2 liters water from the upper cap of the water cooling machine. Total water capacity inside is 4 liters. If not enough, refill rom the upper cap until it's full.

3、When the room temperature is high (more than 35 centigrade degrees), the normal water temperature will increase to 35-40 centigrade degrees.

4、When the inlet temperature of the water chiller exceeds 80 centigrade degrees, or the outlet temperature exceeds 45 centigrade degrees, the smelting should be stopped immediately and the smelting furnace's working switch should be closed. Keep the water cooler open and wait for more than 2 minutes.After the inlet and outlet water temperature drops, turn on the working switch again.

 

5.5L Water Cooler Machine For 4KG Gold Melting Furnace Water Chiller

Prev: 800ml Mini Portable Ultrasonic Cleaner For Jewelry Watches Glasses D-1800
Next: 100g-500g Graphite Ingot Bar Mould Crucible for Melting Gold Casting Refining Silver Ingot
Write a review Your Name:


Your Email:


Your Review:
Rating: